Constructing an MRI Suite is a complex project. Ouellet Construction assembled a team of skilled technicians who were up to the challenge. Through regular owner/ contractor/ architect meetings, they made sure everyone was on the same page and that the site was 100% ready for delivery, on time. The MRI suite was designed with a diverse mixture of wall, cabinet and floor finishes, including a fiber optic ‘star filled sky’ in the ceiling above the MRI. It all came together with surgical precision under Ouellet’s leadership.